MAINTENANCE SCHEDULE
MONTHLY
- Ensure emergency lighting is in its designated place
- Inspect housing for physical damage
- Conduct push test switch for 30 seconds
- Verify lamps are illuminated and aimed in correct direction
- Maintain monthly log for inspection by the authority having jurisdiction (AHJ)
EVERY YEAR
- Conduct a thorough examination of the unit
- Test the battery and lighting system for the required 90 minutes
- Check the condition and voltage of the battery and verify manufacturer date
- Check AC/DC lamps or bulbs for damage and proper operation
- Verify charging circuit is operational and working properly
- Apply emergency lighting test label to each light upon completion